PROJECT 01
INDUSTRIALISED BUILDING SYSTEM
Research buildings (preferably apartments) built entirely or partially using IBS methods and identify all IBS components used, including appropriate dimensions, etc. Design an apartment unit, the size of each unit should not exceed 100 square meters. Concept and framework which includes the suitability of the proposed system, features of the proposed IBS components, fabrication process and sequence of construction shall be included in the report.
Tutor : Dr. Rizal
GROUP MEMBERS
FINAL OUTCOME
REFLECTION
I learned to improve the way I think and solve problems, and improve the daily decisions I will face.
As a group, I was able to develop an ability to understand others, communicate with others, exchange ideas and discuss together.
I learned to set goals to allocate time more effectively, and I can gain motivation within a certain period of time